Current state of works – October 2019

Current state of works – October 2019

The construction of the port infrastructure in October included the following works:
Construction works on vertical quay no. 4 and no. 5 with infrastructure.

They included works in the hinterland of the vertical quays by installing pebble material and geotextiles, works on embedding diaphragms and pilasters, performing concrete and reinforced concrete works of longitudinal and transverse beams of the lower grill, and the construction works of vertical walls of the upper structure.

 

The works on the construction of an industrial port track and an industrial port road with infrastructure were related to: geodetic excavation works, earthworks for excavation and design of drainage system.

Other works included the construction of a fire protection pool.

 

Kontakt info

Šetalište braće Radić 19a, HR-35000 Slavonski Brod
Telefon: +385 (0)35 404 430, Telefaks: +385 (0)35 250 538
E-mail: info@lusb.hr

OIB

OIB: 14562482156

Copyright © 2017 All Rights Reserved.