Current state of works – March 2020

Current state of works – March 2020

The construction of the port infrastructure in March included the following works:

  • Fabrication of reinforcement, formwork of the upper structure coastal structures. Transverse walls and longitudinal walls in axis A and axis C are completed.
  • Continued production of prefabricated PI panels that are supported by longitudinal beam, 10 cm thick and 2.2m in reinforced concrete with compressive strength C30 / 37 (XC / XF1, VDP1).
  • Construction of hydrant network, drainage and test field of the industrial port road structure

Kontakt info

Šetalište braće Radić 19a, HR-35000 Slavonski Brod
Telefon: +385 (0)35 404 430, Telefaks: +385 (0)35 250 538
E-mail: info@lusb.hr

OIB

OIB: 14562482156

Copyright © 2017 All Rights Reserved.