Construction works in August

Construction works in August

Construction works on vertical quay No. 4 and No. 5 included:
Wide excavation in the hinterland below the manipulative plateau.Procurement, delivery and installation of geotextiles and procurement, delivery and installation of gravel in the vertical quays below the manipulative plateau.
The works on the construction of the industrial port track and the industrial port road with infrastructure included:
Excavation of C-category construction pit for the installation of the separator, as well as the procurement, delivery and installation of geotextiles and procurement, delivery and installation of a 250 l/s flow separator.
Reinforced concrete works included:
Works on the hydrant network included preparatory works for excavation, machine excavation in earth material for the basement slab of the basin, with embankment construction under the basement slab of the basin.

eu_co_funded_rgb_en

Kontakt info

Šetalište braće Radić 19a, HR-35000 Slavonski Brod
Telefon: +385 (0)35 404 430, Telefaks: +385 (0)35 250 538
E-mail: info@lusb.hr

OIB

OIB: 14562482156

Copyright © 2017 All Rights Reserved.